Laserfiche WebLink
ARDEN HILLS CITY COUNCIL—OCTOBER 11, 2021 5 <br /> before the guarantee is released. Where this is not done, the City, at its sole discretion, may <br /> use the proceeds of the performance guarantee to accomplish performance. <br /> 7. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior <br /> to commencing any grading, land disturbance or utility activities. The Applicant shall be <br /> responsible for obtaining any permits necessary from other agencies, including but not <br /> limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County prior to <br /> the start of any site activities. <br /> 8. Prior to the issuance of a grading permit, the City Engineer item identified in the October <br /> llth Report to the City Council and the September 1, 2021 Engineering Division memo <br /> shall be addressed. All comments shall be adopted herein by reference. <br /> 9. The final plans shall be subject to approval by the City Engineer, Building Official, and <br /> Fire Marshal prior to the issuance of a grading and erosion control permit. <br /> 10. Final grading, drainage, utility, and site plans shall be subject to approval by the Public <br /> Works Director, City Engineer, and City Planner prior to the issuance of a grading and <br /> erosion control permit or other development permits. <br /> 11. Upon completion of grading and utility work on the site, a grading as-built and utility as- <br /> built shall be provided to the City for review. <br /> 12. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br /> be required and maintained by the Developer during construction to ensure that sediment <br /> and storm water does not leave the project site. <br /> 13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and all <br /> stormwater runoff, sediments and debris during all construction activities. Temporary <br /> stormwater facilities shall be installed to protect the quality aspect of the proposed and <br /> existing stormwater facilities prior to and during construction activities. Maintenance of <br /> any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br /> 14. A right-of-way permit shall be required for work performed within the City right-of-way. <br /> 15. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br /> shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br /> lenses. <br /> 16. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br /> same materials used on the building in accordance with City Code requirements. <br /> 17. A separate sign permit shall be required for all signs on the site. <br /> 18. The sign copy area for the freestanding monument sign shall be reduced from 108 square <br /> feet to 100 square feet as allowed in Sign District 5. Wall signage shall be approved as <br /> requested by the Applicant. A separate sign permit is required for all proposed signage. <br /> 19. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br /> using the same materials and patterns used on the building. Locations shall be approved by <br /> the Planning Department. <br /> 20. The Applicant shall be financially responsible for all applicable water and sanitary <br /> charges. Rates applied shall be memorialized in the Development Agreement. <br /> 21. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br /> shall be sodded or seeded and maintained. The property owner shall mow and maintain all <br /> site boulevards to the curb line of the public streets. <br />