Laserfiche WebLink
CITY OF ARDEN HILLS, MINNESOTA <br />Function: Public Works 604 <br />Activity: Surface Water Management 49550 <br /> <br />Activity Scope <br />Objectives <br />Issues <br />Budget Commentary <br />2019 2020 2021 2022 <br />Budget Summary ACTUAL ACTUAL BUDGET BUDGET <br />Personnel Services 220,540$ 234,580$ 269,580$ 272,590$ <br />Commodities 7,369 6,567 9,300 9,800 <br />Contractual Services 285,301 305,215 317,720 372,440 <br />Capital Outlay - - 747,000 172,100 <br />Other Charges 74,000 74,000 74,000 74,000 <br />Total 587,210$ 620,362$ 1,417,600$ 900,930$ <br />Percent Change 5.6% 128.5% (-36.4%) <br />Full-Time Equivalent positions 2.28 2.48 2.54 2.53 <br />Expenditures by Classification <br />The 2022 operating budget is an increase of 9.8% from the previous year’s budget with a decrease of 36.4% <br />overall with capital outlay. The capital outlay budgeted for in 2022 includes storm sewer structure rehabilitation <br />and the storm water portion of future street improvements. An operating transfer ($74,000) has also been <br />budgeted to the Equipment, Building, and Replacement Fund. <br />2022 BUDGET <br /> Fund # : <br />Activity # : <br />The Surface Water Management Utility Fund is a self-sustaining fund, or enterprise fund of the City. The <br />function of the Surface Water Management (SWM) utility is the collection, treatment and disposition of storm <br />water as well as the maintenance of the storm sewers. The current fee structure is based upon zoning <br />classification and parcel acreage. Collection of these fees is done through the utility billing process. <br />1. Maintain the storm water system including pipes and ponds in an appropriate manner. <br />2. Continue to make environmental improvements to the surface water system whenever cost-effectively <br />1. Budget constraints. <br />2. Increased State and Federal regulations. <br />30% <br />1% <br />42% <br />19% <br />8% <br />Personnel Services <br />Commodities <br />Contractual Services <br />Capital Outlay <br />Other Charges <br />44