My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-13-21-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2021
>
12-13-21-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 11:51:22 AM
Creation date
12/13/2021 11:48:57 AM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2022 2026thru Department Street Department <br /> Description <br />Arden Oaks Dr / Arden Oaks Ct <br />Proposed improvements include spot repair to existing curb, repairs to storm sewer catch basins, hydrant repairs, and sanitary sewer manhole and <br />casting repairs. Full depth reclamation is proposed with new bituminous pavement. <br />Project #22-Str-001 <br />Priority 2 Very Important <br /> Justification <br />Existing street pavement conditions are declining with ratings below 35. Proposed improvements are necessary to continue safe and reliable street <br />and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within <br />the City. <br /> Budget Impact/Other <br />Useful Life 30 <br />Project Name Arden Oaks Neighborhood Streets Category Streets: Reconstruction <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$583,000 <br />Total20222023202420252026Expenditures <br />583,000583,000Construction/Maintenance <br />583,000 583,000Total <br />Total20222023202420252026Funding Sources <br />263,010263,010Capital Improvement Funds <br />(PIR) <br />262,400262,400Other <br />12,38012,380Sanitary Sewer Utility Fund <br />42,10042,100Surface Water Mgmt Utility <br />Funds <br />3,1103,110Water Utility Funds <br />583,000 583,000Total <br />Produced Using the Plan-It Capital Planning Software <br />30
The URL can be used to link to this page
Your browser does not support the video tag.