Laserfiche WebLink
Page 3 of 4 <br />Rodel-Win <br />Report dated 12-Nov-2021 <br />Rodel Version 1.96 <br />Scheme: Single Lane RAB <br />Run number 84 <br />Project: CR E & Old Snelling Redesign2043 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2043 AM Peak - 60 minutes <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 NB Old Snelling Ave None 4.27 4.27 0.20 A A <br />2 EB County Rd E None 4.40 4.40 0.42 A A <br />3 SB Old Snelling Ave None 6.30 6.30 1.02 A A <br />4 WB County Rd E None 9.53 9.53 3.31 A A