My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
01-18-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 8:31:57 AM
Creation date
1/14/2022 8:30:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMS Infrastructure Management Services Arden Hills Report P a g e | 18 <br />Excellent (PCI = 85 to 100) <br /> <br />Dawn Circle from East END to Norma Avenue (GISID 1164, PCI = 97) – Rated as Excellent, displaying <br />little to no surface distresses. The ride is smooth and the surface is non-weathered and the base is strong. <br />In a couple of years, this street segment would be an ideal candidate for routine maintenance activit ies <br />such as crack sealant rehabilitation. <br /> <br />In terms of pavement management efficiency, a program based on worst-first, that is starting at the lowest <br />rated street and working up towards the highest, does not achieve optimal expenditure of money. <br />Generally, under this scenario, agencies can not sufficiently fund pavement rehabilitation and lose ground <br />despite injecting large amounts of capital into the network. <br />The preferred basis of rehabilitation candidate selection is to examine the cost of deferral of a street, <br />against increased life expectancy. <br /> c <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.