My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-18-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
01-18-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 8:31:57 AM
Creation date
1/14/2022 8:30:47 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMS Infrastructure Management Services Arden Hills Report P a g e | 20 <br />The following graph (Figure 9) plots the same pavement condition information, but instead of using the <br />actual PCI value, descriptive terms are used to classify the roadways. <br />• Sixteen percent (16%) of the network can be considered in Excellent condition and require only <br />routine maintenance. <br />• Twenty-six percent (26%) of the network falls into the Very Good classification. These are roads <br />that benefit most from preventative maintenance techniques such as microsurfacing, slurry seals <br />and localized panel repairs. <br />• Twelve percent (12%) of the streets are rated as Good and are candidates for lighter surface-based <br />rehabilitations such as thin overlays or slight panel replacements. <br />• Thirty-four percent (34%) of network can be considered Fair to Marginal condition representing <br />candidates for progressively thicker overlay-based rehabilitation or panel replacements. If left <br />untreated, they will decline rapidly into reconstruction candidates. <br />• The remaining thirteen percent (13%) of the network is rated as Poor or Very Poor, meaning these <br />roadways have failed or are past their optimal due point for overlay or surface-based rehabilitation <br />and may require progressively heavier or thicker forms of rehabilitation (such as extensive panel <br />replacement, surface reconstruction or deep patch and paving) or total reconstruction. <br /> <br />Figure 9 – Roadway Network Present Status Using Descriptive Terms <br />0 <br />5 <br />10 <br />15 <br />20 <br />25 <br />30 <br />35 <br />40 <br />Very Poor (0 to 25)Poor (25 to 40)Marginal (40 to 50)Fair (50 to 60)Good (60 to 70)Very Good (70 to 85)Excellent (85 to 100)Percentage of Network by AreaPavement Condition Using Descriptive Terms <br />City of Arden Hills, MN <br />Current Network Average Condition = 63, Backlog = 13% <br />Pavement Condition Using Descriptive Terms
The URL can be used to link to this page
Your browser does not support the video tag.