My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01 JAN/FEB NL 2022 (PDF)
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2020-2029
>
2022
>
01 JAN/FEB NL 2022 (PDF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 2:52:09 PM
Creation date
2/15/2022 11:57:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Through the Hills: City News <br />Snelling Avenue North PMP <br />Preparations are underway for <br />the Snelling Avenue North street <br />and utility improvements from <br />County Road E to Highway 51 <br />and Cummings Lane. Three <br />design options were given for <br />consideration. City Council chose <br />the third option, which includes <br />a new trail to be constructed <br />along the entire length of Snelling <br />Avenue North on the West side. <br />The proposed design eliminates the <br />shoulder area and will add curbing <br />to both sides of the road. Without <br />the shoulder area, there is no space <br />for on-street parking. Currently, <br />the project is scheduled for the <br />2022 construction season and <br />will be completed the same year. <br />Learn more at cityofardenhills. <br />org/968/Snelling-Avenue-North- <br />Improvements <br />Mounds View High School <br />PUD <br />Mounds View High School <br />received approval for a Planned <br />Unit Development Amendment <br />at the January 10th City Council <br />meeting, finalizing the road <br />and safety improvements for <br />Lake Valentine Road and the <br />parking lot located at 1901 <br />Lake Valentine Road. Traffic <br />and safety improvements along <br />Lake Valentine Road are being <br />completed in two phases. Phase <br />1 is complete as of 2020. Phase <br />2 will include installation of a <br />raised center median to provide <br />additional safety for pedestrian <br />crossings, alignment of the access <br />from the north parking lot with <br />the existing drop-off area, and <br />installation of turn lanes into the <br />North parking lot. Construction on <br />the roadway and North parking lot <br />are anticipated to begin near the <br />end of the current school year with <br />completion of the project prior <br />to the start of the next. Residents <br />may experience slower travel times <br />through the area when workers <br />are on-site. The City will continue <br />to share project updates as details <br />become available. <br />Arden Manor Playground <br />Arden Hills was awarded the <br />Community Development Block <br />Grant (CDBG) to invest in park <br />improvements at Arden Manor <br />Park. Community engagement <br />is a major factor in determining <br />the design and features of the <br />improvements. This project <br />is scheduled for the 2022 <br />construction season and will be <br />completed within the same year. <br />Further updates to come. <br />Intersection at County <br />Road E and Old Snelling <br />Avenue Proposal <br />A study is being conducted <br />by Ramsey County about the <br />intersection of County Road E and <br />Old Snelling Avenue to evaluate <br />strengths and weaknesses of the <br />current design. Ultimately, the <br />goal is to create a new design that <br />improves safety conditions and <br />traffic flow. Construction of the <br />intersection is planned for 2023. <br />In 2018, a proposal with a single- <br />lane roundabout offering safety <br />and operational benefits was <br />considered. Since then, traffic <br />volumes have changed; the current <br />project will reevaluate design <br />options with updated data and <br />forecasting from the new study. <br />Ramsey County aims to identify a <br />design that will be more effective <br />now and in the future. For more <br />details visit www.ramseycounty. <br />us/residents/roads-transportation/ <br />future-road-projects/future-road- <br />construction-projects/county-road- <br />e-old-snelling-avenue-intersection. <br />Arden Oaks PMP <br />Street and minor utility <br />improvements are scheduled for <br />the 2022 construction season. <br />Residents within the Arden Oaks <br />neighborhood will experience <br />moderate disruption for about 2 <br />months while under construction. <br />Visit the project webpage for <br />further details and contact info: <br />www.cityofardenhills.org/1035/ <br />Arden-Oaks-Street-Improvements. <br />Crime Prevention <br />Presentation <br />February 17, 2022 <br />1:00-2:30pm at City Hall <br />The Ramsey County Sheriff's <br />Department will give a <br />presentation about how to avoid <br />fraudulent schemes and scams, <br />and securing your home. People <br />of all ages and backgrounds <br />are victimized by clever scams <br />online, over the phone, and <br />even in person. Participants <br />will learn valuable information <br />about how to avoid falling <br />victim to these sometimes <br />hard-to-detect crimes. <br />Sign up at cityofardenhills. <br />org/361/Recreation-Program- <br />Registration or contact Joe <br />Vaughan, City Recreation <br />Supervisor, at 651-792-7848 for <br />more information.
The URL can be used to link to this page
Your browser does not support the video tag.