My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-21-22-SR
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
03-21-22-SR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2022 3:50:33 PM
Creation date
3/17/2022 3:49:35 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$5'(12$.61(,*+%25+22',03529(0(176$5'(1+,//60,11(627$&,7<352-(&7123:7.'$352-(&712%,'623(1(' 0$5&+$730 '(127(6(5525,1%,''(5&$/&8/$7,21ITEM SPEC.NO. NO. DESCRIPTION QUANTITYUNITMOBILIZATION/6CLEARING75((GRUBBING75((REMOVE CASTING($SAWING BIT PAVEMENT (FULL DEPTH) /)SAWING CONCRETE PAVEMENT (FULL DEPTH) /)REMOVE CURB AND GUTTER /)SALVAGE AND REINSTALL MAILBOX($REMOVE BITUMINOUS DRIVEWAY PAVEMENT 6<REMOVE CONCRETE DRIVEWAY PAVEMENT 6<SALVAGE AND REINSTALL BRICK PAVERS 6<GEOTEXTILE FABRIC TYPE 1 6<GEOTEXTILE FABRIC TYPE 5 6<COMMON EXCAVATION &<SUBGRADE EXCAVATION &<DEWATERING/6SELECT GRANULAR BORROW &<CRUSHED ROCK (1" CLEAR) 71CRUSHED ROCK (3" MINUS) 71TEST ROLLING 52$'67$BASE PREPARATION 52$'67$STREET SWEEPER (WITH PICKUP BROOM) +5WATER 0*$/AGGREGATE BASE CLASS 5 71FULL DEPTH RECLAMATION 6<TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 713" BITUMINOUS DRIVEWAY PATCHING 6<6" PERF PVC PIPE DRAIN /)DRAIN TILE CLEANOUT($CONNECT INTO EXISTING DRAINAGE STRUCTURE($ADJUST VALVE BOX($REPLACE VALVE BOX($CASTING ASSEMBLY($ADJUST FRAME AND RING CASTING ($CONCRETE CURB & GUTTER DESIGN D418 /)CONCRETE CURB & GUTTER DESIGN VALLEY GUTTER /)6" CONCRETE DRIVEWAY PAVEMENT 6<TRAFFIC CONTROL/6STABILIZED CONSTRUCTION EXIT/6STORM DRAIN INLET PROTECTION ($SEDIMENT CONTROL LOG TYPE COMPOST /)COMMON TOPSOIL BORROW &<FERTILIZER TYPE 3 /%CATEGORY 20 - STRAW 6<SEEDING$& SEED MIXTURE 25-151 /% RAPID STABILIZATION METHOD 30*$/TOTALTABULATION OF BIDSUNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTALPRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICEAMOUNT VALLEY PAVING BITUMINOUS ROADWAYS NW ASPHALT MN PAVING & MATERIALS%,'7$%8/$7,213DJH
The URL can be used to link to this page
Your browser does not support the video tag.