Laserfiche WebLink
Bid Tabulation and Engineer’s Estimate <br />Bids Received: Wednesday, March 9, 3:00PM <br />Contractor Total Base Bid <br />Astech Corporation $520,377.70 <br />T.A. Schifsky & Sons $522,711.61 <br />Park Construction $526,500.62 <br />Valley Paving $537,970.10 <br />Bituminous Roadways $547,442.92 <br />NW Asphalt $559,392.91 <br />MN Paving & Materials $578,652.75 <br />North Valley, Inc.$614,885.02 <br />Meyer Contracting, Inc.$679,762.75 <br />Engineer’s Estimate $538,607.50 <br />4