Laserfiche WebLink
D. Modeling and Stress TestingToday: RCWD has agreed to assist by “providing hydrologic/hydraulic data and modeling products.” Matthew Kocian of RCWD will work with Chris Otterness from Houston Engineering, Inc. to leverage recent similar analyses in the RCWD. Chris, a hydrologist, is on retainer with the RCWD and this is project is within the scope of the RCWD mission (“mitigating risk from flooding, and potential water quality impacts from water level bounce (i.e. shoreline erosion).” Therefore, RCWD will fund the modeling effort. Two members of the KLID board, Renee Marino and Gary Gerding, will participate in this effort.Historically:The City retained a consulting firm, URS, to study and propose a pumping and maintenance plan for Karth Lake in 2003. They issued their report to a hydrologist with the DNR in support of permit 2003‐3078 allowing construction of a permanent pumping facility for Karth Lake.