My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-22 Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Karth Lake Improvement District Board
>
Karth Lake Agendas
>
2022
>
04-12-22 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2022 3:46:23 PM
Creation date
4/8/2022 3:45:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Modeling and Stress TestingToday: RCWD has agreed to assist by “providing hydrologic/hydraulic data and modeling products.” Matthew Kocian of RCWD will work with Chris Otterness from Houston Engineering, Inc. to leverage recent similar analyses in the RCWD. Chris, a hydrologist, is on retainer with the RCWD and this is project is within the scope of the RCWD mission (“mitigating risk from flooding, and potential water quality impacts from water level bounce (i.e. shoreline erosion).” Therefore, RCWD will fund the modeling effort. Two members of the KLID board, Renee Marino and Gary Gerding, will participate in this effort.Historically:The City retained a consulting firm, URS, to study and propose a pumping and maintenance plan for Karth Lake in 2003. They issued their report to a hydrologist with the DNR in support of permit 2003‐3078 allowing construction of a permanent pumping facility for Karth Lake.
The URL can be used to link to this page
Your browser does not support the video tag.