My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 APRIL NL 2022 (PDF)
ArdenHills
>
Communications
>
Arden Hills Notes Newsletter
>
2020-2029
>
2022
>
03 APRIL NL 2022 (PDF)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2023 2:52:09 PM
Creation date
4/13/2022 8:52:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Upcoming 2022 Street Construction Projects <br />The City of Arden Hills will <br />undergo a number of construction <br />projects in upcoming months. <br />For more information about each <br />listed project, please visit the City <br />website at cityofardenhills.org/216/ <br />Construction-Projects. <br />Snelling Avenue PMP <br />Snelling Ave North is being <br />reconstructed from County Road <br />E to Highway 51, including <br />Cummings Lane. The project's <br />assessment hearing was April 11th, <br />2022. The assessment rate was <br />approved, the construction contract <br />was awarded to T.A. Schifsky & <br />Sons. Construction will include <br />an asphalt trail on the West side <br />of the road and is scheduled to <br />begin in late spring of this year. <br />A forthcoming schedule detailing <br />important information for affected <br />residents will be sent to them after <br />a preconstruction meeting with the <br />contractor. <br />Arden Oaks PMP <br />"Arden Oaks" refers to Arden <br />Oaks Drive and Arden Oaks Court, <br />which includes approximately 40 <br />single family homes. The area <br />will undergo street and utility <br />improvements in 2022 following <br />approval at the assessment <br />hearing on April 25th, 2022. Once <br />approved, the construction contract <br />will be awarded to ASTECH <br />Corporation. More details are <br />forthcoming, including a detailed <br />schedule that will be sent to the <br />affected residents after meeting <br />with the contractor. <br />MVHS Pedestrian Safety <br />Project on Lake Valentine <br />Road <br />Pedestrian safety is of the utmost <br />importance to Arden Hills' <br />leaders. The goal of the project on <br />Lake Valentine Road in front of <br />Mounds View High School is to <br />make the street safer for students. <br />Construction is scheduled for <br />summer 2022 after school is out <br />and will be completed before <br />the beginning of the 2022-2023 <br />academic year. A main feature of <br />the new design is the inclusion <br />of center concrete medians that <br />enhance the effectiveness of the <br />signalized crosswalk. <br />Spring Pothole Patching <br />The Spring Pothole Patching <br />Project began on March 28th, <br />focusing on the most-traveled and <br />problematic areas of city roads <br />first. Overall, the project prioritizes <br />the abatement of some potholes <br />but not necessarily that of larger <br />potholes or delamination (shallow <br />fractures in the surface of the road). <br />The City’s street maintenance <br />program will likely address <br />delamination, <br />large potholes, <br />cracks, and <br />other street <br />deformities later <br />this summer. <br />To report a <br />pothole or other <br />road quality <br />concerns, please <br />submit a request <br />using the City's <br />RequestTracker. <br />Lexington <br />Avenue <br />Reconstruction <br />Ramsey County <br />is leading a <br />reconstruction <br />project of <br />4 <br />Lexington Avenue from County <br />Road E to I-694. This project <br />will take place in the cities of <br />Arden Hills and Shoreview to <br />improve traffic flow and safety. <br />Construction began the first <br />week of April, when construction <br />signage was first set up along the <br />project corridor. For up to date <br />information, please visit Ramsey <br />County’s project webpage at <br />cityofardenhills.org/lexington- <br />reconstruction-2022. <br />2022 Street Maintenance <br />Project <br />Each year, the City performs street <br />and trail preservation activities in <br />different parts of the city as part <br />of a long-term program. Pavement <br />preservation work for the 2022 <br />construction season will include <br />seal coating, crack sealing, and <br />fog sealing. Details about the <br />project scope and timeline are <br />forthcoming.
The URL can be used to link to this page
Your browser does not support the video tag.