Laserfiche WebLink
Page 2 of 2 <br /> <br />Also, the Council must establish the interest rate at tonight’s Council Meeting. Many cities set their <br />interest rate for assessments at two (2) percentage points over the bond interest rate. The City’s <br />assessment policy states that the interest rate used for the assessment shall be designated at the prime <br />rate plus two (2) percentage points. For the 2021 PMP, the assessment interest rate was set at two (2) <br />percentage points over the assumed bond interest rate which was based on current market conditions <br />at the time, our AAA rating, plus 15 basis points. The result was an assessment interest rate of 3.15%. <br />Our current assumed bond interest rate is 2.90% and the prime rate is 3.50%. Staff would recommend <br />following the City’s assessment policy and setting the assessment rate at 5.50%. <br /> <br />The total project costs were analyzed for the assessable cost. The calculation of the amount to be <br />assessed as approved by Council Resolution 2022-013 is shown below. <br /> <br />• The assessments related to the project are calculated in accordance with the City’s Assessment <br />policy, is half of the street project cost for residential properties. The assessment rate is <br />$5,834.34 per unit as compared to the Engineer’s estimate of $6,131.10. <br /> <br />Arden Oaks Streets <br />Item Calculation Result <br />Construction Cost X 27% Overhead $367,517.20 $466,746.84 <br />50% of Construction Cost $466,746.84 / 2 $233,373.42 <br />Assessment Rate $233,373.42/(40-units) $5,834.34 <br /> <br />The full detailed assessment roll is shown in Attachment B. <br /> <br />To date, no formal objections have been submitted in writing to City staff. Any written objection <br />received prior to Monday evening will be provided to the City Council at the assessment hearing. <br /> <br />As provided for in State Statute, no appeal may be taken as to the amount of any assessment adopted <br />unless a written objection signed by the affected property owner is filed with the City at or prior to <br />the assessment hearing. After the adoption of the assessment roll, property owners who have <br />submitted an objection in writing have 30 days to serve notice of an appeal to the City, and within 10 <br />days after serving notice to file with the District Court. <br /> <br />Recommendation <br /> <br />The Council should hold the Assessment Hearing first. After the Assessment Hearing is closed and <br />as part of New Business, Council should consider adopting Resolution 2022-023 Adopting the <br />Assessment Roll for the Arden Oaks Street Improvement Project with any changes they deem <br />appropriate. <br /> <br />Following the assessment hearing, also under new business, staff will be recommending award of the <br />contract to Astech Corporation as the lowest responsible bidder. <br /> <br />Attachments <br />Attachment A: Assessment Area Map <br />Attachment B: Assessment Roll <br />Attachment C: PowerPoint <br /> <br />