My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
02-22-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 2:59:25 PM
Creation date
4/22/2022 2:56:28 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(b) Caused in whole or in part by any negligent or wrongful act or omission of the <br />Contractor, any subcontractor, anyone directly or indirectly employed by any of them <br />for whose acts any of them may be liable. <br /> <br /> <br />The Project Team <br /> <br />Contract Supervisor: Ryan Spencer will act as the Contract Supervisor for this Project. Mr. <br />Spencer, Rainbow Treecare Municipal Consulting Arborist, is a dedicated full-time employee <br />focused on municipal and governmental forestry, Mr. Spencer is available to quickly respond to <br />any issues that might arise throughout the contract period. <br /> <br />Field Inspectors: All proposed ash trees shall be inspected by a qualified Rainbow Treecare <br />employee. There may be instances when a tree is not in suitable health or condition to <br />recommend treatment. Rainbow Treecare shall have an individual experienced in <br />communicating tree information to the general public to explain such decisions. The person <br />assigned to inspect the trees shall be, at the very minimum, a Certified Minnesota Tree <br />Inspector, have a degree in forestry or a related field, or be an ISA Certified Arborist. The <br />individual shall be qualified to diagnose emerald ash borer; and have experience evaluating tree <br />condition. Additionally, the individual shall be able to explain the benefits and risks of all ash <br />protection options, with regard to pollinators, water quality, human health, and tree health and <br />condition. <br /> <br />Technicians: All treatment technicians for this Project will be drawn from the production staff <br />at RTC and will serve the citizens of Arden Hills with a commitment to the highest level of <br />customer service during the protection of trees located within the City. <br /> <br />Equipment and Treatment Specifications <br /> <br />Upon request, Contractor will demonstrate proficiency with the injection equipment and <br />knowledge of the products used to prevent EAB. <br /> <br />Safety Standards: Contractor will use work methods, safety procedures and personal protective <br />equipment conforming to all ANSI and OSHA standards in performing the work under this <br />contract and will supply any Material Safety Data Sheets (MSDS) to the City upon request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.