My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-22-R (Published 5/5/22)
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
05-09-22-R (Published 5/5/22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 8:44:48 AM
Creation date
5/6/2022 8:43:40 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment Rates <br />5 <br />Project Area Proposed Final <br />Unit Rate <br />Feasibility <br />Unit Rate <br />Snelling Avenue N $4,958 $4,524 <br />Cummings Lane $4,935 $4,071 <br />The Council sets the Interest Rate on Assessments. <br />The Assessment can be payable over a 10-year period. <br />Cummings Lane Assessment Calculation: <br />•Street Project Costs = $78,967 <br />•50% of the Street Project Costs = $39,483.50 <br />•Divided by the Number of Lots (8 Units) = $4,935 <br />Snelling Avenue N Assessment Calculation: <br />•Street Project Costs = $858,055 <br />•50% of the Street Project Costs = $429,027.50 <br />•Divided by the Total Length of Roadway Frontage (8,220 LF) = $52.19 <br />•The Cost per Foot is Multiplied by the Minimum Lot Frontage for an R1 Zoned Property (95 LF) = $4,958
The URL can be used to link to this page
Your browser does not support the video tag.