My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-16-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
05-16-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 9:36:51 AM
Creation date
5/16/2022 9:36:19 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> <br /> <br /> <br />AGENDA ITEM – 1D <br /> <br />MEMORANDUM <br /> DATE: May 16, 2022 TO: Honorable Mayor and City Councilmembers FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Speed Feedback Sign <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br />N/A $2,700 N/A <br /> For Council Consideration <br /> <br />Council should provide direction on a potential future speed feedback sign on CR-96. <br /> <br />Background <br /> <br />In 2021, City Council directed Staff to proceed with the installation of a speed feedback sign <br />along southbound Highway 51 in the area of the Snelling Ave and Glenhill Rd intersections. <br />Staff worked with MnDOT on acquiring a permit and was able to have a sign installed. A picture <br />of the new sign is below. <br /> <br /> <br />On January 18, 2022, this discussion was brought back to Council at a Work Session. The <br />possibility of a sign along northbound Highway 51 was raised, and Council requested staff to not <br />review that area, but rather, placement on CR-96. Specifically, eastbound, between the Holiday <br />gas station and the TH-10 interchange. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.