Laserfiche WebLink
Page 1 of 2 <br /> <br /> <br /> <br />AGENDA ITEM – 1D <br /> <br />MEMORANDUM <br /> DATE: May 16, 2022 TO: Honorable Mayor and City Councilmembers FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Speed Feedback Sign <br /> <br />Budgeted Amount: Actual Amount: Funding Source: <br />N/A $2,700 N/A <br /> For Council Consideration <br /> <br />Council should provide direction on a potential future speed feedback sign on CR-96. <br /> <br />Background <br /> <br />In 2021, City Council directed Staff to proceed with the installation of a speed feedback sign <br />along southbound Highway 51 in the area of the Snelling Ave and Glenhill Rd intersections. <br />Staff worked with MnDOT on acquiring a permit and was able to have a sign installed. A picture <br />of the new sign is below. <br /> <br /> <br />On January 18, 2022, this discussion was brought back to Council at a Work Session. The <br />possibility of a sign along northbound Highway 51 was raised, and Council requested staff to not <br />review that area, but rather, placement on CR-96. Specifically, eastbound, between the Holiday <br />gas station and the TH-10 interchange. <br /> <br />