Laserfiche WebLink
Page 2 of 4 <br /> <br /> <br /> <br />The City Attorney has been looped in and an agreement could be drafted that would allow for the <br />City to reconstruct the parking lot and assess a portion back to the church. Should we move <br />forward, next steps would be to enter into an agreement with the church and have a consultant <br />begin design. <br />Existing layout: <br /> <br /> <br />Visual representation of proposed changes (not to scale and not reflective of stall count): <br /> <br />