My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-06-22 PC Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2022
>
07-06-22 PC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2022 1:31:36 PM
Creation date
6/30/2022 1:28:54 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 19 of 20 <br /> <br />6. Prior to the issuance of a building permit, a landscape financial security equal to 125% of <br />the cost of the landscaping to be installed on the site shall be submitted. The Applicant <br />must submit a detailed cost estimate for the landscaping so staff can determine the final <br />amount. Landscape financial security shall be held for two full growing seasons. For any <br />landscaping that is not in accordance with the approved landscaping plan at the end of two <br />growing seasons, the Developer shall replace the material to the satisfaction of the City <br />before the guarantee is released. Where this is not done, the City, at its sole discretion, may <br />use the proceeds of the performance guarantee to accomplish performance. <br />7. A Grading and Erosion permit shall be obtained from the city’s Engineering Division prior <br />to commencing any grading, land disturbance or utility activities. The Applicant shall be <br />responsible for obtaining any permits necessary from other agencies, including but not <br />limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County prior to <br />the start of any site activities. <br />8. Prior to the issuance of a grading permit, all items identified in the June 20, 2022 <br />Engineering Division memo shall be addressed. All comments shall be adopted herein by <br />reference. <br />9. The final plans shall be subject to approval by the City Engineer, Building Official, and <br />Fire Marshal prior to the issuance of a grading and erosion control permit. <br />10. Final grading, drainage, utility, and site plans shall be subject to approval by the Public <br />Works Director, City Engineer, and City Planner prior to the issuance of a grading and <br />erosion control permit or other development permits. <br />11. Upon completion of grading and utility work on the site, a grading as-built and utility as- <br />built shall be provided to the City for review. <br />12. Heavy duty silt fence and adequate erosion control around the entire construction site shall <br />be required and maintained by the Developer during construction to ensure that sediment <br />and storm water does not leave the project site. <br />13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br />infrastructure and components and any existing storm sewer from exposure to any and all <br />stormwater runoff, sediments and debris during all construction activities. Temporary <br />stormwater facilities shall be installed to protect the quality aspect of the proposed and <br />existing stormwater facilities prior to and during construction activities. Maintenance of <br />any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br />14. A right-of-way permit shall be required for work performed within the City right-of- <br />way. <br />15. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br />shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br />lenses. <br />16. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br />same materials used on the building in accordance with City Code requirements. <br />17. A separate sign permit shall be required for all signs on the site. <br />18. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br />using the same materials and patterns used on the building. Locations shall be approved <br />by the Planning Department. <br />19. The Applicant shall be financially responsible for all applicable water and sanitary <br />charges. Rates applied shall be memorialized in the Development Agreement. <br />20. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br />shall be sodded or seeded and maintained. The property owner shall mow and maintain <br />all site boulevards to the curb line of the public streets. <br />21. The Applicant shall provide an agreement for shared management and maintenance of the <br />site access, parking areas, landscaping, snow removal and common areas for the City
The URL can be used to link to this page
Your browser does not support the video tag.