Laserfiche WebLink
HAZELNUT PARK PLAYGROUND PROPOSALS <br /> • Ms. Walsh informed the Commission that all three 3 proposals meet our budget requirements.( ) <br /> p p g <br /> She indicated that she would like to save the original timbers from the current structure. This <br /> would help save on the cost. <br /> In brief the three (3) proposals were from the following manufacturers: <br /> Earl F. Andersen - This proposal contains two (2) totally separate structures; one for preschool <br /> age children and one for elementary age children. Swings on this proposal are separate. This <br /> proposal has proposed two (2) ADA accessibility access points to the structure. <br /> Note: The Commission suggested that toddler/baby swings be located closest to the <br /> playstructure so you would not have small kids crossing over the regular swings to get <br /> to their area. <br /> Game Time - This proposal contains one (1) structure with quite a bit of platform space. The <br /> swings and sand diggers are together on this proposal but are separated entirely from the <br /> playstructure. Ms. Walsh noted that the stainless steel slide from the current Hazelnut structure <br /> could be incorporated into this one. On a whole, the Commission felt this proposal was not as <br /> "hands on" and interactive as the other two (2) proposals. <br /> • Miracle -This proposal had two (2) options; both of them were proposed as one (1) unit with <br /> preschool age activities on one end of the structure. Once again, the Commission felt that the <br /> long rampways may not be the safest for the children. <br /> FUTURE MEETING DATES <br /> The next meeting will be held on Tuesday, April 22, 1997. <br /> ADJOURNMENT <br /> The meeting was adjourned at 7:30 p.m. <br />