Laserfiche WebLink
ARDEN HILLS PARKS DEPARTMENT • <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (1 ) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3) , and (4) suggested• priority for blacktopping in the future as/if funds <br /> are available <br /> Length Surface <br /> Arden Trail <br /> Glenpaul to Stowe 2 ,575 ' Ag Lime 2 <br /> Stowe to Co Rd E 1 , 500 ' Grass 2 <br /> Chatham Trails <br /> Connection 1 , 200' i60 ' hard 4 <br /> surface, 1, 040 <br /> grass , blocks <br /> Corridors <br /> (600' leading to Valentine School) <br /> Natural Area Pathways 8, 400' Grass <br /> To%..n House Trails <br /> Village Hall Trail 2 ; ?00 ' Grass 3 • <br /> NSP Trail 1. , 300 ' Grass <br /> Corridor 0' Grass <br /> Floral to Norma Corridor 600 ' A Lim,e _ <br /> Cummings Park to Floral Trail <br /> Cummings Park Trail 1 , 500' Grass 3 <br /> Cummings to Floral 2 , 050 ' Grass 2 <br /> Floral 2,000 ' Grass 3 <br /> Crepeau Nature Preserve <br /> Nature Trails 2, 800' Grass <br /> BREAKDOM4 BY RUNNING FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15, 540 feet <br /> Phase 4 4 , 580 feet <br />