Laserfiche WebLink
• ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (.1) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3), and (4) suggested priority for blacktopping in the future as/if funds <br /> are available <br /> Length Surface <br /> Arden Trail <br /> ✓'Glenpaul to Stowe 2,575' Ag Lime 2 <br /> ,,-Stowe to Co Rd E 1 ,500' Grass 2 <br /> Chatham Trails <br /> connection 1 ,200 ' 160 ' hard 4 <br /> surface, 1 ,040 <br /> grass , blocks <br /> ,,-- Corridors 4 <br /> (600' leading to Valentine School) <br /> Natural Area Pathways 8,400' Grass <br /> Town House Trails <br /> • Village Hall Trail ?, 300 ' Grass 3 <br /> NSP Trail 1. , 300 ' Grass 3 <br /> Corridor 740 ' Grass 4 <br /> t/Floral to Norma Corridor 600 ' Ag Lime 1 <br /> Cummings Park to Floral Trail " <br /> Cummings Park Trail 1 ,500 ' Grass 3 <br /> Cummings to Floral 2,050 ' Grass 2 <br /> ,l/1{lora1 ( -) 2,000 ' Grass 3 <br /> Crepeau Nature Preserve <br /> Nature Trails 2,800' Grass 4 <br /> BREAKDOWN BY RUNNING FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15,540 feet <br /> Phase 4 4,580 feet <br />