My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-18-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
07-18-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 12:45:16 PM
Creation date
7/14/2022 12:43:55 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2023 2027thru Department Water Department <br /> Description <br />Proposed replacement of watermain crossings along MN-51 at Glenhill Road (8-inch CIP), between Cummings Lane and Ingerson Road (8-inch <br />CIP), and near Red Fox Road (12-inch CIP). New watermain will consist of DIP or PVC. <br />Project #26-W-002 <br />Priority 3 Important <br /> Justification <br />The existing watermain material is CIP and over 50 years old. CIP is more prone to breaks as it ages compared to DIP or PVC. These crossings <br />are vital to supplying consistent water distribution on each side of MN-51. MnDOT is scheduled to resurface MN-51 in 2026. <br /> Budget Impact/Other <br />Useful Life 30 <br />Project Name MN-51 Watermain Crossing Improvements Category Utility Maintenance <br />Type Unassigned <br />TCAAP No <br />Total Project Cost:$190,000 <br />Total20232024202520262027Expenditures <br />190,000190,000Construction/Maintenance <br />190,000 190,000Total <br />Total20232024202520262027Funding Sources <br />190,000190,000Water Utility Funds <br />190,000 190,000Total <br />Produced Using the Plan-It Capital Planning Software <br />33
The URL can be used to link to this page
Your browser does not support the video tag.