Laserfiche WebLink
• ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (1) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3) , and (4) suggested priority for blacktopping in the future as/if funds <br /> are available <br /> Length Surface <br /> Arden Trail <br /> ✓ 1 <br /> Glenpaul to Stowe , 500' Grass 2 <br /> ' Ag Lime 2 <br /> ,� Stowe to Co Rd E ,500 <br /> Chatham Trails <br /> Connection 1 ,200' 160' hard 4 <br /> surface, 1,040 <br /> grass, blocks <br /> 4 <br /> Corridors 1 <br /> (600' leading to Valentine School) <br /> .--'Natural Area Pathways 81400' Grass 4 <br /> Town House Trails <br /> Village Hall Trail 2,300 ' Grass 3 <br /> NSP Trail 1 ,300' Grass 3 <br /> v, Corridor 740' Grass 4 <br /> V Florai to Norma Corridor 600' Ag Lime 1 <br /> Cummings Park to Floral Trail <br /> Cummings Park Trail 2,050' Grass <br /> 0' Grass 3 <br /> Cummings to Floral , 2 <br /> 2,000' Grass 3 <br /> Floral <br /> Crepeau Nature Preserve <br /> 2,800' Grass 4 <br /> Nature Trails <br /> BREAKDOWN BY RUNNING FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15,540 feet <br /> Phase 4 4,580 feet <br />