Laserfiche WebLink
ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (.1) section recommended `or <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3) , and (4) suggested priority for blacktopping in the future as/if 'funds <br /> are available <br /> Length Surface <br /> Arden Trail <br /> ✓Glenpaul to Stowe 2,575 ' Ag Lime 2 <br /> ,,-Stowe to Co Rd E 1 ,500 ' Grass 2 <br /> Chatham Trails <br /> A Connection 1 ,200' 160 ' hard 4 <br /> surface, 1 ,040 <br /> grass, blocks <br /> Corridors <br /> (600' Leading to `valentine School) <br /> Natural Area Pathways 8,400' Grass <br /> Town House Trails <br /> Village Hall Trail 2, 300 ' Grass 3 <br /> NSP Trail. 1 , 300 ' Grass 3 <br /> Corridor /40 ' Grass 4 <br /> L/�Florai to Norma Corridor 600' Ag Lime 1 <br /> Cummings Park to Floral Trail <br /> Cummings Park Trail 1 ,500 ' Grass 3 <br /> Cummings to Flor1al 2,050 ' Grass 2 <br /> .,W� coral / 2,000' Grass 3 <br /> Crepeau Nature Preserve <br /> Nature Trails 2,800 ' Grass 4 <br /> BREAKDOWN BY RUNNING FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15, 540 feet <br /> Phase 4 4, 580 feet <br /> �^„Zy i'l�itit� <br />