Laserfiche WebLink
• ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (1) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3), and (4) suggested priority for blacktopping in the future as/if funds <br /> are available <br /> 'Length Surface <br /> Arden Trail <br /> Glenpaul to Stowe 2,575' Ag Lime 2 <br /> Stowe to Co Rd E 1 ,500' Grass 2 <br /> Chatham Trails <br /> Connection 1 ,200' 160' hard 4 <br /> surface, 1,040 <br /> grass, blocks <br /> Corridors 4 <br /> (600' leading to Valentine School) 1 <br /> Natural Area Pathways 8,400' Grass 4 <br /> Town House Trails <br /> • Village Hall Trail 2, 300' Grass 3 <br /> NSP Trail 1 ,300 ' Grass 3 <br /> Corridor 740' Grass 4 <br /> Floral to Norma Corridor 600 ' Ag Lime 1 <br /> Cummings Park to Floral Trail <br /> Cummings Park Trail 1,500 ' Grass 3 <br /> Cummings to Floral 2,050' Grass 2 <br /> Floral 2,000' Grass 3 <br /> Crepeau Nature Preserve <br /> Nature Trails 2,800' Grass 4 <br /> BREAKDOWN BY RUNNING FOOT <br /> Phaca 1 620 feet <br /> • <br />