My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-1994 PRTC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1990-1998
>
1994
>
11-22-1994 PRTC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 12:11:16 AM
Creation date
7/21/2022 3:09:17 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> CITY OF ARDEN H= <br /> • MEM RANDUK <br /> DATE: June 20, 1994 <br /> TO: Parks and Recreation Camnittee <br /> FROK: Cindy Severtson, Parks and Recreation Director C 5 <br /> SUBJECT: Parks and Recreation Ccamittee Update <br /> Maintenance Report <br /> The park maintenance staff has been working with the public works <br /> staff to repair a storm sewer drainage area. This storm sewer nuns <br /> under our trail near Lexington Avenue from Cuummings Park. The area <br /> under our trail was eroding away due to the large an-cunt of water that <br /> nuns through on its way to Karth Lake. This was a potential safety <br /> hazard since someone walking or biking on the trail could have gone <br /> off the edge and fallen into the eroded area. The trail had to be <br /> closed temporarily to allow for the trucks and equipment to travel <br /> back and forth from Cummings Park. There was also an area of trail <br /> . that was breaking up because of tree roots growing up through the <br /> trail. The trail was repaired by our staff after the drainage area <br /> was filled in and new pipes were installed under the trail. The trail <br /> is back in working order and the previously eroded areas have been <br /> filled. <br /> The tennis court at Hazelnut Park has been resurfaced. Lines have <br /> also been painted on the basketball court at Hazelnut. <br /> Trees and shrubs have been planted at the new structure at County Road <br /> E and Lexington. Edging and wood chips will be added as time allows. <br /> The Cl-�nmings Park fencing project is complete. However, our crew will <br /> use timbers to build a retaining wall in back of the dug out areas. <br /> This will help to stop erosion and improve the appearance of that <br /> area. An eagle scout, Paul Straumann, has been working on projects at <br /> Cummings Park to fulfill his eagle scout requirements. The projects <br /> he is working on include; painting the hockey rink boards, planting <br /> trees and staining the warming house. <br /> It <br />
The URL can be used to link to this page
Your browser does not support the video tag.