Laserfiche WebLink
• Meeting discussion following the Foundation Report <br /> Pro ram Report: <br /> Handout covering Fall Program numbers was distributed. The Winter brochure will be mailed <br /> out to the residents the last week in November. <br /> Per Park MarketinE Plan: <br /> The City Council consented to paying up to $2000 for Kate Huebsch's services to help with <br /> ill be made on November 7 to the Light Brigade <br /> developing a Marketing Plan. A presentation w <br /> requesting funds towards Perry Park. <br /> Directors Report - Cindv Walsh: <br /> Valentine Park- Update <br /> The warming house is completed except for painting. The project is over budgeted by <br /> approximately $500.00. The location of the new structure required some changes in electrical <br /> wiring which had to be done by NSP. The ball field has been moved and the backstop fence is in <br /> place. The infield will be flooded as the skating rink. The parking lot should be paved in the <br /> very near future. The project has been delayed due to rain. <br /> Vandalism: <br /> Phon_ e lines <br /> - Hazelnut and Cummings Parks have had their phone lines smashed an <br /> a. <br /> • pulled out. We will reroute them inside. <br /> b perr_____y park - The heater inside the warming house has been smashed. Repair may be <br /> more costly than replacement. <br /> 3 <br />