Laserfiche WebLink
Setbacks <br />The Arden Hills City Code states “at least fifty percent (50%) of the largest building on each site <br />shall be constructed at the front setback line.” <br />The multi-tenant building does not meet this code and seeks flexibility in setback design and <br />orientation to meet the below setbacks. By placing the multi-tenant building on the northern <br />portion of the site, it conceals the less appealing back-of-house, drive-thru, but is still <br />welcoming and has active glass on both Grey Fox and Lexington Avenue with “step-back” <br />storefront glass reveals.