Laserfiche WebLink
<br /> David Swearingen <br />June 20, 2022 <br /> <br /> <br /> 3 <br />41. An existing utility pole conflict is shown with the proposed sidewalk at the eastern end of Grey Fox Road. <br />Who is installing that sidewalk, Developer or County? Pole needs to be relocated. <br />42. Site Plan note 5 – Any structures within ROW no longer being used should not be abandoned. <br />43. Site Plan note 10 – provide referenced ARCH/MEP plans for lighting and site electrical review. <br />44. Site Plan note 12 – provide architectural plans for dumpster enclosure location and review. <br />45. Site Plan note 16 – ADA parking stalls are shown different sizes. Confirm requirements and provide <br />details. <br />C400 – GRADING PLAN <br />46. Only a Stormwater Management Area is noted on the plans. Need additional stormwater system <br />information, details, structures, manufacturer information, etc. to be able to perform stormwater system <br />review. <br />47. Confirm how car wash exit area will drain. Only a 0.10’ fall in about 90-feet. <br />48. Show flow lines in car wash driveway areas. <br />49. A fall od 0.02’ is shown along gutter line on curb to the west of car wash area. Add flow lines to confirm <br />drainage. <br />50. Show elevations at entrance of car wash <br />51. Confirm what the PVC connection to car wash area is. Is it gutter, or car wash water? <br />52. Is car wash a self-contained unit, or how is wash area collected, treated and drained? <br />53. Car wash ADA parking area does not show an accessible ramp. <br />54. Low spot shown on western driveway at ADA ramp. No CB is shown. <br />55. Stormwater from driveway within property limits is draining off-site. <br />56. Storm system from OCS-1 is connecting to system in Lexington. Confirm this is consistent with Ramsey <br />County plans and construction schedule or provide alternative stormwater system connection. <br />57. Is developer or Ramsey County constructing sidewalk and boulevard improvements along Lexington? <br />Confirm plans are coordinated. <br />58. Provide pipe information for connection to proposed retail building. <br />59. General Grading Plan note 3 – only HDPE and PVC pipes are shown. <br />60. General Grading Plan note 18 – provide elevation. <br />61. General Grading Plan note 21 – Site has areas with less than minimum grades. <br />62. Stormwater Management Notes note 1 – Filtration basins are noted. Is filtration being provided? Need <br />more information, details, calcs, etc. <br />C401 – GRADING DETAILS <br />63. Only a typical section is provided for the PRINSCO HRDROSTOR HS180. Additional manufacturer and <br />stormwater information, structure and pipe details need to be provided to complete the stormwater <br />review. <br />64. Storm system appears to be a “bottomless” system. Additional manufacturer and geotechnical information <br />and reports need to be provided to complete stormwater review. <br />C500 – UTILITY PLAN <br />65. Where does water connect to carwash?