My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
07-25-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 3:35:55 PM
Creation date
7/21/2022 3:30:55 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 20 <br /> <br />Planning Staff has identified the use of clear polycarbonate as a request for flexibility under the <br />PUD for building materials and transparency requirements. In the above table, Planning Staff <br />has separated out the percentage of glass versus polycarbonate materials on the south façade. <br />The square footage of polycarbonate material for the garage door on the south elevation would <br />be the same size as the north elevation so Planning Staff was able to calculate these separately. <br />For this report, the use of clear polycarbonate has been factored under “other materials” and has <br />not been included in the proposed transparency percentage shown in the above table. <br /> <br />Under Section 1325.05, Subd. 8, F.1, the City may consider a proportional reduction in the <br />transparent window and door requirement on the public street façade if additional transparent <br />glass is used on the remaining sides. The table above identifies the percentage of transparency <br />only as the proposed square footage of glass. <br /> <br />Rendering of West and East Elevations <br /> Rendering of South and North Elevations <br />
The URL can be used to link to this page
Your browser does not support the video tag.