My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-06-2001 PTRC Special Worksession (2)
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes (1999 to Present)
>
1999-2009
>
2001
>
10-06-2001 PTRC Special Worksession (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2024 12:08:28 AM
Creation date
7/21/2022 4:07:58 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Community Meeting Summary - <br /> Community Meeting Summaries - July 9-12, 2001 <br /> (#) indicates meeting number. <br /> Introduction - <br /> Four community meetings were held during the week of July 9-12, 2001 at various <br /> locations around the city. Approximately 80 attended the meetings. Meeting participants <br /> provided input regarding the overall city park, trail and open space system and individual <br /> parks and trails. The community input is summarized below. This input combined with <br /> the April, 2001 public opinion survey and interviews with stakeholders and affiliates will <br /> assist the Parks, Trails and Recreation Commission with preparation of the Arden Hills <br /> Parks, Trails and Open Space Plan. <br /> General Comments— <br /> Need Collaboration with Ramsey County Colleges and school Districts. (1,2,3,4) <br /> Picnic Facilities (3) <br /> - Add shelter, shade structures (3) <br /> • Save/conserve open space (4) <br /> Indoor Recreation needed for swimming and indoor track, art classes and history center <br /> (4) <br /> Nature Center(1,2,3,4) <br /> Keeping up the existing park system will be adequate (4) <br /> Hwy 96 barrier to movement (When will trails be ready?) (4) <br /> Finish Tony Schmidt system(trail connections to park along Lk. Johanna Blvd., etc) (2) <br /> Plow trails in winter(4) <br /> When will TCAAP be ready(4) <br /> Trail/Signage connections (4) <br /> Trail/road crossing possibility at Hamline and Snelling RR bridge (3) <br /> • Bridge over highway 10 (2) <br /> Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001 <br /> Page 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.