My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-039
ArdenHills
>
Administration
>
City Council
>
Resolutions
>
2020-2029
>
2022
>
2022-039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2022 1:34:14 PM
Creation date
7/26/2022 1:34:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. The project shall be completed in accordance with the submitted plans as amended by <br /> the conditions of approval. Any significant changes to these plans, as determined by <br /> the City Planner, shall require review and approval by the Planning Commission and <br /> City Council. <br /> 2. The Master and Final Planned Unit Development approval shall expire one year from <br /> the date of City Council approval unless a building permit has been requested or a time <br /> extension has been granted by the City Council. The City Council may extend the <br /> expiration date of such approval upon written application by the person to whom the <br /> approval was granted. <br /> 3. A violation of any condition set forth in the permit shall be a violation of this Code, <br /> and shall be cause for revocation of the permit. <br /> 4. A Master and Final PUD Development Agreement shall be prepared by the City <br /> Attorney and subject to City Council approval. The Master and Final PUD <br /> Development Agreement shall be fully executed prior to the issuance of building <br /> permits. <br /> 5. The applicant shall file the Final Plat with Ramsey County within 180 days of the <br /> approval from the City. <br /> 6. Prior to the issuance of a building permit, a landscape financial security equal to 125% <br /> of the cost of the landscaping to be installed on the site shall be submitted. The <br /> Applicant must submit a detailed cost estimate for the landscaping so staff can <br /> determine the final amount. Landscape financial security shall be held for two full <br /> growing seasons. For any landscaping that is not in accordance with the approved <br /> landscaping plan at the end of two growing seasons, the Developer shall replace the <br /> material to the satisfaction of the City before the guarantee is released. Where this is <br /> not done, the City, at its sole discretion, may use the proceeds of the performance <br /> guarantee to accomplish performance. <br /> 7. A Grading and Erosion permit shall be obtained from the city's Engineering Division <br /> prior to commencing any grading, land disturbance or utility activities. The Applicant <br /> shall be responsible for obtaining any permits necessary from other agencies,including <br /> but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey <br /> County prior to the start of any site activities. <br /> 8. Prior to the issuance of a grading permit, all items identified in the June 20, 2022 <br /> Engineering Division memo shall be addressed. All comments shall be adopted herein <br /> by reference. <br /> 9. The final plans shall be subject to approval by the City Engineer,Building Official,and <br /> Fire Marshal prior to the issuance of a grading and erosion control permit. <br /> 10. Final grading,drainage,utility, and site plans shall be subject to approval by the Public <br /> Works Director, City Engineer, and City Planner prior to the issuance of a grading and <br /> erosion control permit or other development permits. <br /> 11. Upon completion of grading and utility work on the site, a grading as-built and utility <br /> as-built shall be provided to the City for review. <br /> 12. Heavy duty silt fence and adequate erosion control around the entire construction site <br /> shall be required and maintained by the Developer during construction to ensure that <br /> sediment and storm water does not leave the project site. <br /> 13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and <br /> all stormwater runoff, sediments and debris during all construction activities. <br /> Temporary stormwater facilities shall be installed to protect the quality aspect of the <br /> proposed and existing stormwater facilities prior to and during construction activities. <br /> Maintenance of any and all temporary stormwater facilities shall be the responsibility <br /> of the Applicant. <br /> To view the final document,access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting <br /> cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.