My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-03-22 PC Agenda Packet
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Planning Commission
>
Planning Commission Packets
>
2022
>
08-03-22 PC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2022 4:31:57 PM
Creation date
7/27/2022 4:31:22 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2022 LAND USE APPLICATION: Delkor Systems and Colder Products Company (CPC) <br />Delkor’s Main Entrance. As shown in the <br />floor plan at right, Delkor’s main entrance <br />is located on the southwest elevation of <br />the building. Due to the building <br />structure and Delkor’s desire to optimize <br />warehouse space, this corner of the <br />building was the most logical location for <br />office space and the main entrance. <br /> <br />Section 1260.01. The sign ordinance requires that, “In order to approve any sign standard adjustment, <br />the following criteria of Subd. 1 or Subd. 2 shall be satisfied, and the necessary criteria of Subd. 3 shall <br />be satisfied: <br />x Subd. 1 There are site conditions which require a sign adjustment to allow the sign to be <br />reasonably visible from a street immediately adjacent to the site; <br />x Subd. 2 The sign adjustment will allow a sign of exceptional design or a style that will enhance <br />the area or that is more consistent with the architecture and design of the site; <br />x Subd. 3 The sign adjustment will not result in a sign that is inconsistent with the purpose of the <br />zoning district in which the property is located or the current land use.” <br />Addressing Subd. 1 and 2, a sign adjustment is required to identify and orientate customers to Delkor <br />and CPC entrances. Since the southwest elevation of the building is shared by both parties, and Delkor’s <br />main entrance is on this façade, tenants are concerned that visitors will misidentify the locations of both <br />parties’ main and secondary entrances. In <br />addition, the design of the sign is simple and <br />elegant complimenting the colors and features <br />of the building. The additional sign [requested] <br />will be identical to the sign already installed on <br />the south elevation—picture at right. For <br />additional details, please reference the <br />‘Gateway Interstate-Sign Plan 6-21-22’ also <br />enclosed.
The URL can be used to link to this page
Your browser does not support the video tag.