Laserfiche WebLink
4 ,- <br /> -, <br /> 'See HELP'directs you to important additional information and assistance in Instructions,page 1. <br /> IS THIS AN ORIGINAL OR AMENDED NOTICE? (check one): <br /> This is an original notice,dated ❑This is an amended notice,dated <br /> 1. APPLICANT CONTACT INFORMATION: <br /> Name of applicant: Ramsey County Department of Public Works <br /> Contact person(name and title): Jim Tolaas <br /> Complete mailing address: 3377 North Rice Street,St.Paul,MN 55126 <br /> Business phone:(651)482-5203 Fax: (651)482-5232 email: <br /> 2. PROJECT IDENTIFICATION(See HELP 2): CSAH 3(County Road I)Reconstruction <br /> Also attach PROJECT LOCATOR MAP. <br /> 3. LAND USE: Describe existing land use in project area. See HELP 3. Residential, Fire Station,Elementary School,Twin <br /> Cities Army Ammunitions Plant Highways, right-of-ways,Open Space,Utilities,Historic Lepak Farmhouse,light <br /> Industrial <br /> 4. PROJECT CATEGORY (check all that apply): <br /> ® Repair,rehabilitation,reconstruction or replacement of existing roads that impact wetlands(including wetland areas of DNR Public <br /> Waters). If so,indicate size of impact(check one): <br /> [ ]Less than 10,000 square feet of wetlands [X]Greater than 10,000 square feet of wetlands <br /> ❑ New road or modification of an existing road solely to increase traffic capacity impacting any amount of wetland area <br /> ❑ River,lake or stream impact(excluding wetland areas of DNR Public Waters) <br /> ❑ Placement,maintenance or repair of linear utility projects <br /> 5. PROPOSED TIMELINE: Approximate project start date: August 2002 Projected end date: November 2004 <br /> 6. PROJECT DESCRIPTION: Check all that apply. Also include a detailed overhead view of your plan that clearly depicts the <br /> work to be undertaken. See What To Include on Plans(Instructions,page 2). <br /> ❑Guardrail improvement El Slope flattening <br /> ❑Guardrail improvement with slope flattening ❑Turn lane:improvement of existing or new construction <br /> N Resurfacing ❑Bridge work:repair <br /> N Culvert work:repair,extension or replacement ❑Bridge work:replacement <br /> ❑Stream diversion N Reconstruction(existing roads) <br /> N Shoulder work:widening,shoulder widening ❑Additional lanes solely for traffic capacity <br /> with ditch grading N New road construction <br /> N Other: storm water pond construction ❑Linear utility projects <br /> 7. ESTIMATED PROJECT COST: $1,500,500 FUNDING SOURCES (estimate%): Federal_State Local 100 <br /> 8. SEQUENCING CONSIDERATIONS: What alternatives to this proposed project have you considered that could have avoided or <br /> minimized impacts to wetlands or water? List at least two alternatives(one of which may be"no_build"or"do nothing'),and <br /> explain why you chose to pursue the option described in this application over these alternatives. (If space below is not adequate, <br /> attach separate sheet labeled SEQUENCING CONSIDERATIONS.) <br /> See Attachment A.- Z��J <br /> - <br /> j <br /> 1 <br />