My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-22-PTRC
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Packets (2010 to Present)
>
2020-2029
>
2022
>
07-26-22-PTRC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2022 2:29:53 PM
Creation date
7/28/2022 2:29:36 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hazelnut Park, Planting Proposal, Area #1 <br /> 18 th June 2022 <br /> OVERVIEW <br /> In the section of Hazelnut Park that lies between the southern entrance (off Prior Ave.) and the tennis <br /> courts, I propose that we add more native plant species. Most notably, it would involve replacing the <br /> section of sparse grass that lies between the trail and the woods with an assortment of relatively-short <br /> native grasses and sedges that are better adapted to the shady conditions, along with a mix of <br /> shade-loving flowers. <br /> GOALS <br /> 1. Improve the appearance of this area with flowers that bloom from spring through fall. <br /> 2. Improve wildlife habitat by providing: <br /> a. Pollen & nectar sources for pollinators <br /> b. A variety of host plants for insects which, in turn, are an important food source for birds. <br /> SPECIFICATIONS <br /> 1. Current Photos <br />Attachment A
The URL can be used to link to this page
Your browser does not support the video tag.