Laserfiche WebLink
11-8-83 <br /> Arden Hills Parks Dept. <br /> Park Development Up-date <br /> CUKA I NGS PARK <br /> Site grading completed <br /> Park area fertilized & seeded <br /> Park entrance work completed <br /> Infield for ballfield completed <br /> Backstop being installed <br /> HAZELNUT PARK <br /> Service road resurfaced <br /> Some landscaping completed <br /> PERRY PARK <br /> Athletic fields aeriated b fertilized <br /> Field # 2 redesigned <br /> Some top dressing on lower fields completed <br /> FLORAL PARK <br /> Service road constructed <br /> CREPEAU PARK <br /> Pathway cleared and mowed <br /> PEDESTRIAN TRAILS <br /> 3 corridors upgraded in Chatham Addition <br /> 1 corridor upgraded at Edgewater <br /> Arden Trail graded several times <br /> All pedestrain trails mowed several times during summer <br />