Laserfiche WebLink
• A . Anderscn presented a possible planning schedule for use in <br /> planning and development indicating the role of the Site Develop <br /> - <br /> ment Sub-Committee In the process . <br /> J . Moore suggested we p-epare a list of possible facilities to <br /> Include approximate costs and space needed . This could be used <br /> in aidingci tizens to Indicate preferences and priorities in <br /> development. J . Buckley and J . Moore are preparing this list. <br /> We discussed the need for the establishment of trails as quickly <br /> as possible. It was suggested that to enable raold development <br /> of trail systems and best use of avalrable funds we propose that <br /> paths witVin the parks ae initially wood chip surface and trails <br /> between parks be crushed time insofar as the budget will allow . <br /> Note: at $. 73 per foot, crushed lime on the power line corridor <br /> (east-west) from Old Snelling to east end of McClung property <br /> would cosT approximately $ 1 , 500. <br /> Request Cclmmittee _Action as Foilows : <br /> I . Accept guidelines for planning process ;, with or without re- <br /> visiors. <br /> 2. PossIole budget revisions : <br /> • a . Rovise development budget to spend move on pathways using <br /> crushed lime. <br /> b . Overate within our current budg:atj using chips to estab- <br /> t sh trails. <br /> 3. Request the Bike Trail Committee to investigate the pass i b I - <br /> Iity ref a pathway on Naml ne from Indian Oaks to Floral <br /> Park Approximately 500 feet-) . <br /> • <br />