Laserfiche WebLink
ARDEN HILLS CITY COUNCIL— JULY 25, 2022 7 <br /> 8. Prior to the issuance of a grading permit, all items identified in the June 20, 2022 <br /> Engineering Division memo shall be addressed. All comments shall be adopted herein by <br /> reference. <br /> 9. The final plans shall be subject to approval by the City Engineer, Building Official, and <br /> Fire Marshal prior to the issuance of a grading and erosion control permit. <br /> 10. Final grading, drainage, utility, and site plans shall be subject to approval by the Public <br /> Works Director, City Engineer, and City Planner prior to the issuance of a grading and <br /> erosion control permit or other development permits. <br /> 11. Upon completion of grading and utility work on the site, a grading as-built and utility as- <br /> built shall be provided to the City for review. <br /> 12. Heavy duty silt fence and adequate erosion control around the entire construction site <br /> shall be required and maintained by the Developer during construction to ensure that <br /> sediment and storm water does not leave the project site. <br /> 13. The Applicant shall be responsible for protecting the proposed on-site storm sewer <br /> infrastructure and components and any existing storm sewer from exposure to any and all <br /> stormwater runoff, sediments and debris during all construction activities. Temporary <br /> stormwater facilities shall be installed to protect the quality aspect of the proposed and <br /> existing stormwater facilities prior to and during construction activities. Maintenance of <br /> any and all temporary stormwater facilities shall be the responsibility of the Applicant. <br /> 14. A right-of-way pen-nit shall be required for work performed within the City right-of-way. <br /> 15. All light poles, including base, shall be a maximum of 25 feet in height and shall be <br /> shoebox style, downward directed, with high-pressure sodium lamps or LED and flush <br /> lenses. <br /> 16. All rooftop or ground mounted mechanical equipment shall be hidden from view with the <br /> same materials used on the building in accordance with City Code requirements. <br /> 17. A separate sign permit shall be required for all signs on the site. <br /> 18. Any future trash enclosures shall utilize wooden gates and be constructed on three sides <br /> using the same materials and patterns used on the building. Locations shall be approved <br /> by the Planning Department. <br /> 19. The Applicant shall be financially responsible for all applicable water and sanitary <br /> charges. Rates applied shall be memorialized in the Development Agreement. <br /> 20. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, <br /> shall be sodded or seeded and maintained. The property owner shall mow and maintain <br /> all site boulevards to the curb line of the public streets. <br /> 21. The Applicant shall provide an agreement for shared management and maintenance of the <br /> site access, parking areas, landscaping, snow removal and common areas for the City <br /> Attorney to review and for the City Council's approval prior to the approval of the Master <br /> and Final PUD Development Agreement. <br /> 22. The proposed structures shall conform to all other regulations in the City Code. <br /> 23. The Applicant shall provide a copy of the Stormwater Management Report and <br /> verification of Rice Creek Watershed approval prior to the approval of Development <br /> Agreement. <br /> 24. The Applicant shall reduce the menu board signage for the fast food restaurant in the <br /> multi-tenant building to be compliant with Section 1240.04. <br /> 25. The Applicant shall be required to pay a park dedication fee equivalent to the City's <br /> portion of the cost for the sidewalk installation along Lexington Avenue as part of the <br />