My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
08-22-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:18:07 AM
Creation date
8/19/2022 7:50:21 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget Impact <br /> To date, the City has collected $115,440 in Tree Replacement funds. <br /> The City Code states: <br /> 1325.055; Subd. 6; A. 3. d) Where tree replacement on-site is not practical and a suitable off- <br /> site location cannot be determined by the City, a fee in lieu thereof may be assessed for <br /> the replacement required. The fee amount shall be the cost of materials and <br /> installation tree, plus ten (10) percent, and shall be provided by the applicant and approved by <br /> the City. All funds collected shall be expended exclusively for implementation of the goals listed <br /> in Subd. 1 of this section. <br /> The materials and installation of the proposed trees for the 2022 Tree Plan would include all <br /> listed bid items in Attachment A, less the watering bags, which totals $68,020. The $2,200 will <br /> be covered by the General Fund—Park Maintenance department. <br /> Attachments <br /> Attachment A: Bid Tabulation <br /> Attachment B: Project Plans <br /> Attachment C: Contract with Margolis <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.