My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-22-22-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2022
>
08-22-22-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:18:07 AM
Creation date
8/19/2022 7:50:21 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment C <br /> AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> FOR CONSTRUCTION CONTRACT <br /> THIS AGREEMENT is made this 22 day of $ , 2022 (hereinafter"Effective Date of the Contract") by and <br /> between the City of Arden Hills, Ramsey County, Minnesota(hereinafter"Owner")and Margolis Company <br /> (hereinafter"Contractor"). The Owner and Contractor hereby agree as follows: <br /> ARTICLE 1 —THE WORK AND THE PROJECT <br /> 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work <br /> is generally described as follows: The preparation, providing, installation, maintenance and <br /> warranty of trees shown in the plans along the boulevard in Highway 96, Thom Ct, Oak Ave and <br /> also within Perry Park. Layout and spacing of trees will be close to what is shown in the plans but <br /> minor adjustments around existing conditions and conflicts should be expected. <br /> 1.02 The Project, of which the Work under the Contract Documents is a part is generally described as <br /> follows: 2022 Tree Plan Project, City Project No. PW-12-0014 (2022). <br /> ARTICLE 2—CONTRACT DOCUMENTS <br /> 2.01 The Contract Documents consist of the following: <br /> A. This Agreement <br /> B. Proposal Form <br /> C. Insurance Certificates <br /> D. Instructions to Bidders <br /> E. Division 1 —General Requirements <br /> F. Drawings consisting of five (5) sheets with each sheet bearing the following general title: <br /> Tree Planting Plan, dated 2022. <br /> G. Exhibits to the Agreement <br /> 1. Contractor's Bid and Proposal Form <br /> 2. Non-Collusion Affidavit <br /> 3. Responsible Contractor Verification and Certification of Compliance Form <br /> H. The following which may be delivered or issued on or after the Effective Date of the <br /> Contract and are not attached hereto: <br /> 1. Notice to Proceed <br /> 2. Work Change Directives <br /> 3. Change Orders <br /> 4. Field Orders <br /> 2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and <br /> they are as fully a part of the Agreement as if hereto attached or herein repeated. <br /> 2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the <br /> General Conditions and Supplemental Conditions. <br /> ARTICLE 3—CONTRACT TIMES <br /> 3.01 Contract Times: The Work will be substantially completed on or before November 15th, 2022 or <br /> winter freeze up, whichever comes first, and completed and ready for final payment in accordance <br /> with Paragraph 15.06 of the General Conditions on or before November 15th, 2024. Substantial <br /> Completion Date shall be defined as the completion of all items with the exception of maintenance, <br /> watering, inspection and warranty work. <br /> 3.02 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final <br /> payment as stated in the Contract Documents are of the essence of the Contract. <br /> 2022 Tree Plan Project AGREEMENT <br /> PW-12-0014(2022) 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.