Laserfiche WebLink
Attachment C <br /> 2022 LAND USE APPLICATION: Delkor Systems and Colder Products Company (CPC) <br /> 06/28/2022 <br /> From Application Form. Request is for additional signage on southwest elevation of Gateway Interstate <br /> building.Tenants, Delkor Systems and Colder Products Company(CPC) have collaborated on a <br /> comprehensive sign plan (enclosed).Tenants are seeking flexibility since southwest elevation is shared <br /> and additional signage will clarify and designate entrances for both parties. Main entrance for Delkor is <br /> located on this elevation [southwest]. <br /> Original Signage Approval. The signage on original site plan rendering below was approved between <br /> Michael Conzemius of Scannell Properties and Jessica Jagoe of the City of Arden Hills in July of 2021. See <br /> image below. <br /> a, <br /> C <br /> , h <br /> nA <br /> 0 <br /> l <br /> e <br /> �, <br /> i <br /> •� •`� <br /> Changes. Since the signage approval last summer,the building has changed to two (2) tenants instead <br /> of three (3) as shown. The tenants are Colder Products Company(CPC) occupying the spaces of Tennant <br /> #1 and#2 above and Delkor Systems, Inc. occupying space#3 (purple shaded zone). <br />