My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-1986 PTRC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1980-1989
>
1986
>
09-23-1986 PTRC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2024 12:05:45 AM
Creation date
8/25/2022 4:06:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Minutes of Regular Parks and Recreation Committee Meeting <br /> Page 2 <br /> 1. Park Shelter (cost not to exceed $15,000) (Plan 1, Miller Report) <br /> a. Foundation slab <br /> b. 20' x 20' building - 10' open bay (roof overhang) in front <br /> c. Hip roof, with 2' overhang (roof size 24' x 32' ) <br /> d. Asphalt shingles <br /> e. Redwood siding <br /> f. Plywood ceiling inside and outside (under overhang) to prevent injuries <br /> to skaters inside, and birds nesting outside. <br /> g. One steel pedestrian door, and 8 foot overhead equipment door <br /> h. Interior insulation (fiberglass bat) and paneling (if affordable given <br /> $15,000 limit on expenditure). <br /> 2. Lighting of hockey rink and general skating area per Musco proposal (April <br /> 30, 1986, at cost not to exceed $8,500. Wiring of shelter by same <br /> contractor, Buckley to negotiate with Musco Lighting for this, at cost not <br /> to exceed $3,000 (total not to exceed $11,500). <br /> 'on of hocke <br /> y rink and general skating area at cost not to exceed <br /> 3. Constructs y g 8 <br /> $15,000. Labor to be provided by Parks maintenance personnel. Boards to <br /> be removed at end of skating season. <br /> Motion carried unanimously. <br /> • North Snelling Park <br /> Miller reported that grading of the playing field area has been completed. The <br /> North Heights Lutheran Church contractor has deposited some top soil in the <br /> area of the pond; it will be his responsibility to grade this area evenly to <br /> the edge of the pond and eliminate the drainage ditch which runs on park <br /> property. Miller and Buckley will monitor to ensure this is done. <br /> When grading is completed, the area will be seeded by Parks personnel (probably <br /> in late August) . <br /> Proposed 1987 Budget <br /> Summer Playground Program <br /> No increases or changes are planned in this budget for 1987. <br /> Rautio asked Committee input re fees for this program, since Finance <br /> Committee last year had discussed raising fees and including t-shirts. <br /> They are now $5.00 per participant. It was determined that Arden Hills' <br /> fees at this time are comparable with neighboring communities; committee <br /> recommends no change in fees, and not including t-shirts. <br /> Skating Rinks <br /> 1986 expenditures are anticipated to be about $1,000 over budget, mostly in <br /> Acct. 104 (rink attendants). Last winter's weather was such that the <br /> skating season extended one week longer than normal, and there were fewer <br /> days when rinks were closed. <br /> • The 1987 Budget is increased by approximately $5,000. Two additional rinks <br /> will need to be maintained, and an attendant provided for the new Cummings <br />
The URL can be used to link to this page
Your browser does not support the video tag.