My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-29-1986 PTRC Meeting Minutes
ArdenHills
>
Administration
>
Commissions, Committees, and Boards
>
Parks, Trails and Recreation Committee (PTRC)
>
PTRC Minutes/Packets/(1968 to 2009)
>
1980-1989
>
1986
>
07-29-1986 PTRC Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2024 12:12:01 AM
Creation date
8/25/2022 4:07:52 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUMMINGS PARK SHELTER <br /> SPECIFICATIONS <br /> Based upon discussion at the May meeting of the Parks and Recreation <br /> Committee and conversation with John Buckley, a park building with the <br /> following specifications was investigated: <br /> 20' X 20' building <br /> 10' open bay (roof overhang) in front <br /> Hip roof (trusses) with 2' overhang (roof size 24' X 32' ) <br /> Asphalt shingles <br /> Textured plywood siding <br /> Plywood ceiling inside and outside (under overhang) <br /> One steel pedestrian door <br /> One 6' -wide overhead equipment door <br /> Concrete slab base <br /> Options <br /> Cedar shake shingles <br /> Redwood beveled lap-siding <br /> • PRELIMINARY COST ESTIMATES <br /> 1. CONTRACTOR CONSTRUCTED ("stick-built") <br /> a. Foundation slab (including base and excavation) $ 1,800.00 <br /> b. Materials 4,500.00 <br /> c. Labor (including profit and overhead) 6,500.00 <br /> TOTAL 12,800.00 <br /> d. Shake shingle roof 750.00 <br /> e. Redwood siding 800.00 <br /> 2. CEDAR FOREST PRODUCTS PREFAB <br /> a. Foundation slab $ 1,800.00 <br /> b. Materials (delivered) 11,600.00 <br /> c. Assembly 7,000.00 <br /> TOTAL $20,400.00 <br /> d. Shake shingle roof 850.00 <br /> 3. AMERICAN LEISURE DESIGNS PREFAB* <br /> a. Foundation slab $ 1,800.00 <br /> b. Materials (delivered) 11,000.00 <br /> c. Assembly 5,000.00 <br /> TOTAL 17,800.00 <br /> d. Shake shingle roof 800.00 <br /> *Preliminary quote. Subject to adjustment. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.