Laserfiche WebLink
1 <br /> ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> Proposed Blacktopping Schedule <br /> The trails were divided into four categories: (1 ) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain; (2) , <br /> (3) , and (4) suggested priority for blacktopping in the future as/if funds <br /> are available <br /> ,Length Surface <br /> Arden Trail <br /> Glenpaul to Stowe 2,575 ' Ag Lime 2 <br /> Stowe to Co Rd E 1 ,500' Grass 2 <br /> Chatham Trails <br /> Connection 1 ,200' 160' hard 4 <br /> surface, 1,040 <br /> grass, blocks <br /> Corridors 4 <br /> (600' leading to Valentine School) i <br /> Natural Area Pathways 8,400' Grass 4 <br /> Town House Trails <br /> Village Hall Trail 2, 300' Grass 3 <br /> • NSP Trail 1 ,300' Grass 3 <br /> Corridor 740 ' Grass 4 <br /> Floral to Norma Corridor 600' Ag 'Lime 1 <br /> Cummings Park to Floral Trail <br /> Cummings Park Trail 1,500' Grass 3 <br /> Cummings to Floral 2,050' Grass 2 <br /> Floral 2,000' Grass 3 <br /> Crepeau Nature Preserve <br /> Nature Trails 2,800' Grass <br /> BREAKDWN BY RUNNING FOOT <br /> Phase 1 620 feet <br /> Phase 2 6, 125 feet <br /> Phase 3 15,540 feet <br /> Phase 4 4,580 feet <br />