Laserfiche WebLink
1988 PARK DEVELOPMENT PLANS <br /> Creapeau Nature Preserve 1988 Proposed 1988 Actual <br /> • <br /> Prairie Flower Area 750 <br /> North Snelling Park <br /> Tennis Court 50,000 19,640 <br /> Tennis Net 190 <br /> Softball Backstop 1, 100 1,013 <br /> Infield Material 1,532 <br /> Play Climbing Structure 9,000 8,939 <br /> Misc. Expense for Installing Play Structure 1,475 <br /> Misc. Expense for Installing Picnic Shelter 527 <br /> Seed <br /> 204 <br /> Sod <br /> General Skating 108 <br /> 00 <br /> Picnic Tables and Grills 600 <br /> Hazelnut Park <br /> Tennis Court Resurfacing 1,560 <br /> Hockey Security Light 690 <br /> Sampson Park <br /> Basketball Backboard 241 <br /> Valentine Park <br /> Basketball Backboard 241 <br /> • Asphalt 38 <br /> Cummings Park <br /> Tennis Court Repair 370 <br /> Arden Manor <br /> Play Climbing Structure 7,000 6,991 <br /> Tennis Court Resurfacing 2,900 <br /> Basketball Court Repair 210 <br /> Misc. Cost 1,279 <br /> Trails 314 <br /> Signs 500 <br /> Benches 1,000 <br /> Surfacing and Bridges (Hard surface) t4,olt p� rwrA 25,000 <br /> Ingerson Park <br /> West Access to Park 10,000 <br /> Total �5. ) 48,462 <br /> sl,ys � <br />