Laserfiche WebLink
5 <br />Criteria West/North East/South <br />User Experience Consistent boulevard, Tony Schmidt <br />natural area passage <br />Proximity to lake, narrower <br />boulevards/confined feeling in areas <br />Connectivity Direct neighborhood access Direct beach access <br />Scope of Roadway Modifications <br />Improvements <br />Minimal roadway modifications along <br />Tony Schmidt Park frontage Roadway modifications entire length <br />Crossings/Conflicts 23 Driveways, 5 local streets 37 driveways, 4 local streets <br />Grading/Retaining Wall Scope Anticipated between Lake Lane and <br />County Road E <br />Anticipated between Lake Lane and <br />County Road E <br />ROW/Easement Needs Minimal needs Minimal needs <br />Surface Utility Conflicts Intermittent power poles Significant stretches with power poles, <br />mailboxes, hydrants <br />Cost (in 2022 dollars)$$$$$