Laserfiche WebLink
Professional Services Agreement <br />Little Lake Johanna and Pike Lake Stormwater Retrofit Analysis <br />220191 <br />09/21/2022 <br />Page 3 of 11 <br /> <br />Version2.3 02052021 <br />• Draft Analysis Report, PDF format. <br />• Final Analysis Report, PDF format. <br />• Associated GIS, P8 and data files, electronic format. <br />Schedule <br />• Project Initiation and Data Gathering: September 27 – October 14, 2022. <br />• Desktop Analysis: October 1 – November 15, 2022. <br />• Field Reconnaissance: October 15 – November 1, 2022. <br />• Analysis: November 16 – December 31, 2022. <br />• Draft report submittal: January 15, 2023. <br />• Final report February: February 15, 2023. <br /> <br />This schedule was prepared to include reasonable allowances for review and approval <br />times required by the CLIENT and public authorities having jurisdiction over the project. <br />This schedule shall be equitably adjusted as the project progresses, allowing for changes <br />in the scope of the project requested by the CLIENT or for delays or other causes beyond <br />the control of COMPANY. <br /> <br />4.0 Items not included in Agreement/Supplemental Services <br />The following items are not included as part of this AGREEMENT: <br /> <br />• Field survey. <br />• Environmental and Archeological and cultural surveys. <br />• Hydrologic and Hydraulic Modeling. <br />• Engineering plans and specifications. <br />• Wetland delineation, determination or permitting. <br />• Project permitting. <br /> <br />Supplemental services not included in the AGREEMENT can be provided by COMPANY <br />under separate agreement, if desired. <br /> <br />5.0 Services by Others <br />• N/A <br /> <br />6.0 Client Responsibilities <br />• Supplemental GIS assistance. <br />• Providing spatial data sets (GIS). <br />• Attendance and participation in meetings. <br /> <br />7.0 Professional Services Fee <br />7.1 Fees <br />The fee for services will be based on COMPANY standard hourly rates current at the time <br />the AGREEMENT is signed. These standard hourly rates are subject to change upon 30 <br />days’ written notice. Non-salary expenses directly attributable to the project such as: (1)