Laserfiche WebLink
CONTINUATION SHEET AIA DOCUMENT G703 PAGE 2 OF 2 <br />AIA Document G702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing <br />Contractor’s signed Certification is attached.APPLICATION NUMBER: 2 <br />In tabulations below, amounts are stated to the nearest dollar.APPLICATION DATE: 9/13/22% <br />PERIOD FROM: 2/25/22% <br /> TO: 9/13/22% <br />A B C D E F G H I J K L M N <br />Balance <br />ITEM DESCRIPTION OF WORK U/M QUANTITY UNIT PRICE CONTRACT PREVIOUS THIS TO PREVIOUS THIS TOTAL COMPLETED PERCENT To Finish <br />No.AMOUNT QUANTITY PERIOD DATE PERIOD PERIOD TO DATE COMPLETE <br />BASE <br />1 Mob/de-mob LS 1 5,000.00 5,000.00 0.00 0.50 0.50 0.00 2,500.00 2,500.00 50%2,500.00 <br />2 Bond cost LS 1 1,500.00 1,500.00 0.00 1.00 1.00 1,500.00 0.00 1,500.00 100%0.00 <br />3 Erosion control LS 1 2,500.00 2,500.00 0.00 0.50 0.50 0.00 1,250.00 1,250.00 50%1,250.00 <br />4 Demolition LS 1 10,000.00 10,000.00 0.00 1.00 1.00 0.00 10,000.00 10,000.00 100%0.00 <br />5 Bypass pumping LS 1 15,000.00 15,000.00 0.35 0.65 1.00 5,250.00 9,750.00 15,000.00 100%0.00 <br />6 Replace top slabs LS 1 20,000.00 20,000.00 0.00 1.00 1.00 0.00 20,000.00 20,000.00 100%0.00 <br />7 Coatings LS 1 16,000.00 16,000.00 0.00 1.00 1.00 0.00 16,000.00 16,000.00 100%0.00 <br />8 Concrete flatwork LS 1 10,000.00 10,000.00 0.00 1.00 1.00 0.00 10,000.00 10,000.00 100%0.00 <br />9 Install pumps LS 1 6,200.00 6,200.00 0.00 1.00 1.00 0.00 6,200.00 6,200.00 100%0.00 <br />10 F&I piping LS 1 24,500.00 24,500.00 0.00 1.00 1.00 0.00 24,500.00 24,500.00 100%0.00 <br />11 Electrical LS 1 10,000.00 10,000.00 0.00 1.00 1.00 0.00 10,000.00 10,000.00 100%0.00 <br />12 Asphalt driveway LS 1 8,000.00 8,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0%8,000.00 <br />13 Restoration LS 1 2,000.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0%2,000.00 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />CONTRACT TOTAL 139,100.00 6,750.00 110,201.00 125,350.00 90%13,750.00 <br />QUANTITY COMPLETEDCONTRACT WORK COMPLETED