Laserfiche WebLink
8/30/2022 Page 1 of 16 <br />SRF Consulting Group, Inc.Work Tasks and Person-Hour Estimates <br />Client:City of Arden Hills <br />Project:MVHS Trail - Final Design Amendment <br />Subconsultants:Braun Intertec 14320.PP <br />TASK NO.SUMMARY OF TASKS <br />1 PROJECT MANAGEMENT <br />2 UTILTY COORDINATION <br />3 FINAL PS&E <br />4 PERMITTING <br />5 BIDDING ADMINISTRATION <br />6 CONSTRUCTION ADMINISTRATION <br />7 CONSTRUCTION INSPECTION <br />8 CONSTRUCTION SURVEY <br />9 SUBMISSION OF WORK / AS-BUILT PLAN <br />Project Overview: <br />City has secured a $450K Safe Routes to School (SRTS) grant. This is administered by the State Aid office and subjects our plan documents to State Aid Review. <br />Bidding documents to be assembled as a stand-alone package, but will be bid with other Ramsey County projects <br />The City of Arden Hills has identified a need for construction administration, survey, inspection, and testing services for construction of the Mounds View High School Trail Improvements along <br />Lake Valentine Rd and Snelling Ave N. This includes state Safe Routes to School (SRTS) funds, and construction will need to meet State-Aid requirements. The project is currently in final design, <br />and is tentatively to be constructed in the 2023 construction season. The improvements include installation of bituminous and concrete walks/trails, utility work, grading, curb and gutter, <br />paving, and retaining wall improvements. <br />SRF CONSULTING GROUP, INC. <br />14320ScopeOfWorkTemplateDetailed_REV.xlsx <br />MINNEAPOLIS. MN