My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-15-22-WS
ArdenHills
>
Administration
>
City Council
>
City Council Minutes
>
2020-2029
>
2022
>
08-15-22-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 8:45:45 AM
Creation date
9/27/2022 8:45:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARDEN HILLS CITY COUNCIL WORK SESSION — AUGUST 15, 2022 7 <br />Public Works Director/City Engineer Swearingen said it was his understanding the drainage <br />issues were at the catch basin, not along the street. The pavement is complete but seeding hasn't <br />taken place. Staff could look into a cost-effective alternative for curb in that area. <br />Councilmember Radziej suggested using the type of curbing that is sometimes used in <br />landscaping. <br />Councilmember Holden asked if the old Smith Medical Building was full, and thought the <br />information could be given at the State of the City. <br />Councilmember Radziej said he had been seeing semitrucks with trailers on the north side of the <br />road at International Paper. <br />Councilmember Scott said he would forward an email he received regarding a rental property on <br />Grant Avenue. He also asked about the drainage pond on Indian Oaks trail. <br />Public Works Director/City Engineer Swearingen said the pond was lowered 2.5 feet, and it <br />now sits at the outlet elevation. <br />Mayor Grant reported that he has been using his laptop instead of a paper copy of the agenda for <br />the last eight months and felt it was working. He invited other Councilmembers to try going <br />paperless. <br />Councilmember Holmes said she would try going paperless. <br />City Administrator Perrault asked if Council would like to schedule a Special Work Session <br />with Ramsey County to discuss the staging of the roundabout on County Road E, on either <br />September 12 or 26, and before or after the Council meeting. <br />It was determined to schedule the special meeting on September 12. <br />City Administrator Perrault stated the cost to stripe pickleball courts was $275. <br />After discussion it was decided to have the contractor stripe a court at Freeway Park, and two <br />courts at Hazelnut Park. <br />ADJOURN <br />Mayor Grant adjourned the City Council Work Session at 8: p.m. <br />r <br />Jo ne Trauba David Grant <br />Deputy City Clerk Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.