Laserfiche WebLink
Page 2 of 2 <br /> <br /> <br /> <br />Budget Impact <br /> <br />A summary of the estimated project costs and funding sources is provided below: <br /> <br />Total Project Costs <br /> Construction Cost $ 130,700.00 <br /> Pumps and Control Panel $ 78,560.70 <br /> Engineering Services $ 49,400.00 (Includes Construction Admin.) <br /> Misc. (Legal, Ads) $ 333.85 <br /> TOTAL $ 258,994.55 <br />. <br />This project is covered by the sanitary sewer fund. <br /> <br />Attachments <br /> <br />Attachment A: Invoice for Pumps and Control Panel <br />